Specific Description of Gluing Wall System
Gluing Wall
This Slotted Dry Hanging façade system is to fix metal pipes to the concrete wall. Then the stone panels and metal frame are connected with metal hangings.
Drilling holes in concrete walls and metals, then the metal plate is connected with a concrete wall with an expansion bolt or chemical anchor. The L-shape metal hanging pieces are welded to the metal plate, and a vertical metal tube is fixed to the wall by means of bolt connection. It will need to be Installed a vertical metal tube at a distance of 1.5 to 2 meters. After all the vertical and horizontal metal pipes are installed, the stone panels can be mounted on metal frames.
Specifications Of Stone Wall Panels
An important feature of gluing system is that it is more secure than the conventional technology system because it is reinforced with hooks and can be installed in exterior and interior wall decoration.
For considering the cost of the stone and installation, the size of the natural stone slabs, PFM natural stone slabs come in 120×60 x1cm(48″x24″x3/8″), 60x60x1cm (24″x24″x3/8″), 60x30x1cm (24″x12″x3/8″), 30*30*1cm(12″x12″x3/8″). This glued wall and flooring system applied to outdoor walls within 20 meters height. As well as the interior decorative walls and floor.
EML believes that we can design and manufacture what you want.
Gluing Wall System Installation Process
Specific Description Of Gluing Flooring System
This Advanced Gluing System is suitable for interior flooring, and According to different customer’s design needs, PFM flooring tiles come in 120×60 (48″x24″),60×60(24″x24″ ) ,60×30(24″x12″),30×30(12”x12”). For home , the thickness of tiles should be 1-2cm (3/8 “to 3/4″), and for Commercial , pfm proposed tiles thickness size to be 2CM (3/4”).
Before installation, we should confirm that the ground already has the installation conditions, then use equipment to make the horizontal line and the dividing line of construction.
After the preparations have been made, place the proper amount of cement mortar (or special ceramic tile adhesive) on the ground and stick the panel to a fixed position on cement mortar (or special ceramic tile). At last, using a special cloth to cover surface to prevent pollution. The total solidify time is 2-3 days.
The Advanced Gluing Wall and Flooring System represents a cutting-edge approach to surface installation, providing a secure and efficient solution. This system involves using advanced adhesives to bond stone panels directly to the substrate, eliminating the need for mechanical fixings.
This adhesive-based approach ensures a seamless, visually appealing finish while offering various benefits, including enhanced flexibility, reduced installation time, and increased structural integrity. The Advanced Gluing System is particularly advantageous for vertical applications like walls and flooring, providing architects and builders with a contemporary, efficient, and aesthetically pleasing alternative to traditional installation methods.